Item |
Description |
|
Permit required for all new construction, renovations, alterations, additions, repairs, decks, swimming pools, re-roofing, storage sheds/outbuildings, etc.
|
|
Permit required for the installation of all solid fuel burning appliances such as wood and pellet stoves.
|
|
Permit required for the placement of a single wide or double wide manufactured HUD home. Also for all other construction to HUD homes.
|
|
Permit required for the demolition of any structure.
|
|
Permit required for the installation of new and replacement septic systems.
|
|
Permit required for the erection of a new sign.
|
|
Permit required for all existing signs which do not have permits. NO signs are grandfathered or exempt from the requirement.
|
|
Permit required for special events. The sign can be displayed for a period no longer than 30 days.
|