| Permit required for all new construction, renovations, alterations, additions, repairs, decks, swimming pools, re-roofing, storage sheds/outbuildings, etc. |
| Permit required for the installation of all solid fuel burning appliances such as wood and pellet stoves.
|
| Permit required for the placement of a single wide or double wide manufactured HUD home. Also for all other construction to HUD homes. |
| Permit required for the demolition of any structure.
|
| Permit required for the installation of new and replacement septic systems.
|
| Permit required for the erection of a new sign. |
| Permit required for all existing signs which do not have permits. NO signs are grandfathered or exempt from the requirement. |
| Permit required for special events. The sign can be displayed for a period no longer than 30 days. |
| Submit this form when applying for a building permit for a deck. |